Archive for the 'Clean Water Act' Category

NJ Appeals Court addresses permits for combined sewer overflows.

SteveK March 12th, 2013

The Appellate Division recently handed down an opinion in In re Petition to Revoke Statewide General CSO Permit.  In that case, a group of private environmental watchdog groups brought suit to force the NJDEP to cancel certain Combined Sewer Overflow (CSO) general permits issued to municipalities with combined sewer systems.
In 1994, the USEPA issued a national control policy for CSOs, which created a framework for controlling CSO discharges through the use of permits.  This policy provided what are known as the “Nine Minimum Controls” aimed at reducing the prevalence and impacts of CSOs without necessitating major construction or significant engineering studies.
In 2004, NJDEP issued a General CSO Permit to affected municipalities in accordance with these Nine Minimum Controls, which would allow those municipalities to operate their sewer systems and to discharge CSOs when necessary.  The General Permit went into effect on August 1, 2004, and was set to lapse on July 31, 2009.  However, prior to the expiration date, the affected municipalities requested an administrative extension, which, under N.J.A.C. 7:14-2.8(a), triggers a continuation of that permit’s effect until such a time as the extension is either granted or denied.  Accordingly, the 2004 permit remains in effect.  On April 15, 2011, the plaintiff environmental groups filed a written request that the NJDEP revoke and replace the General Permit with individualized permits involving tighter controls.
On September 15, 2011, NJDEP issued its final decision denying appellants’ request that the General Permit be revoked and reissued with conditions, stating that it did “not agree that this existing General Permit is inconsistent with State or federal law.”  Further, revocation was not necessary because NJDEP “intend[ed] to reissue the existing general permit with revised conditions to reflect the current status of the compliance with the nine minimum controls and Long Term Control Plan requirements.”  This appeal followed.
After the notice of appeal was filed, NJDEP advised that its plans had changed with regard to the General Permit.  Specifically, rather than reissuing a new General Permit, it would replace it with individual permits issued to each CSO owner, and to modify or renew existing individual permits to sewerage treatment plants that receive sewer flows.
The parties agreed that CSOs are a problem and that changes need to be made to the way the municipalities and sewer treatment plants which discharge them should be regulated, but they differed as to how that should occur.  The environmental group plaintiffs argued that the General Permit must be immediately revoked and simultaneously reissued, or replaced with individual permits, with a variety of new conditions to address their concerns.  NJDEP, on the other hand, argued that it would be a waste of time and resources to prosecute a revocation action against each of the affected municipalities when it was already in the process of issuing new individual permits to replace the disputed General Permit.
The court noted that N.J.A.C. 7:14A-16.6(a), which sets forth the valid “causes for revocation,” specifically states that the conditions therein are “causes for suspending or revoking a permit during its term.”  On the other hand, the General Permit at issue had expired and was on administrative extension, under which circumstances N.J.A.C. 7:14A-2.8 applies.  That provision gives NJDEP a variety of options, including revocation or replacement of the extended permit.  Accordingly, NJDEP’s action under these circumstances was fully supported by these regulatory provisions.
Further, the court agreed that “it makes little practical sense to initiate a costly and time-consuming revocation process against twenty-one municipalities when the General permit has expired and is on an administrative extension.”  Instead, “[b]y focusing on reissuing new individual permits, with more stringent conditions, DEP will make better use of its scarce resources and reach the same end result now sought by appellants.”  Ultimately, “there is simply no need for DEP to first revoke the General Permit in order to issue the new individual permits[;] [i]t may simply propose and issue the new permits.”
Finally, because the affected municipalities were not parties to the present appeal, and it did not even appear that they were notified of the request to revoke the General Permit, the court would be unable to grant the requested relief in the first instance.  “No permit can be revoked unless each permittee is given the opportunity to request a contested case hearing concerning the proposed revocation.”

DiFrancesco, Bateman, Coley, Yospin, Kunzman, Davis, Lehrer & Flaum, PC (www.dbnjlaw.com ) is a full service law firm in New Jersey which provides a broad range of legal services, including the representation of clients in environmental and defense of toxic exposure matters. For additional information about the matters in this bulletin or in the firm’s environmental practice, please contactSteven A. Kunzman, Esq. who heads our Environmental and Latent Injury Litigation Department.

The information contained in this blog is intended solely for informational purposes; it is a advertising publication of DiFrancesco, Bateman, Coley, Yospin, Kunzman, Davis, Lehrer & Flaum P.C.This publication is intended to alert recipients of developments in the law and is not intended to provide legal counsel, advice or opinion on any specific facts or circumstances. The contents are intended as general information only. You are urged to consult a member of this firm or your own attorney concerning your particular situation and any specific legal questions you might have.

 

Courts Define Limits of EPA’s Control of Storm Water under Clean Water Act

SteveK February 13th, 2013

Recent decisions U.S. District Court in the Eastern District of Virginia and the U.S. Supreme Court define the limits of the extent to which authorities can control discharges of storm water under the Clean Water Act (CWA). On January 3, 2013, in Virginia Dept. of Transp. V. U.S. E.P.A., the Eastern District of Virginia held that the EPA is authorized to set Total Maximum Daily Loads (TMDL) of pollutants permitted to be discharged into bodies of water under the CWA; however, TMDLs do not apply to storm water carrying sediment, because storm water runoff is not a pollutant under the CWA.  As a result of prior unrelated litigation, the EPA was required to set TMDL limits for discharges into the Accotink Creek, a tributary of the Potomac River in Fairfax County, Va. , because the creek was determined to have “ ‘benthic impairments,’ which is to say the community of organisms that live on the bottom of the creek were not as numerous or healthy as they should be.” The EPA placed a limit on the flow of storm water into the creek due, in part, to a determination that the storm water contained sediment which is considered a pollutant. The Court analyzed the language of the CWA and concluded that although it authorizes the establishment of TMDLs for pollutants, and sediment is a pollutant, it could not place limits on storm water containing sediment because storm water is not a pollutant under the act. The Court concluded that Congress had been very specific in providing “precise standards and definite guidelines on how the environment should be protected” and does not extend the authority to the EPA to establish TMDLs for non-pollutants as surrogates for pollutants. Accordingly, the limits placed on the storm water flow rate into the creek were voided.Five days later, on January 8, 2013, the Supreme Court issued a decision in Los Angeles County Flood Control District v. NRDC 568 U.S. ___(2013) which held that a “discharge of pollutants” does not occur when polluted water flows from one portion of a navigable water body through “concrete channel or other engineered improvement” into another section of the water body.  In the case, the Flood Control District operates a “municipal separate storm sewer system” that collects and discharges storm water. The Court concluded that it does not qualify as a discharge of pollutants under the CWA, quoting from the Second Circuit decision, Catskill Mountains Chapter of Trout Unlimited, Inc. v.  New. York, 273 F. 3d. 481, 492 (CA2 2001) “…[i]f one takes a ladle of soup from a pot, lifts above the pot, and pours it back into the pot, one has not added soup or anything else to the pot.”These two decisions demonstrate an intention to strictly construe the CWA, and provide a practical, if not holistic, view of the hydrogeological systems. Although not specifically stated in Virginia DOT, storm water may be seen as a natural source of water that drains into navigable waters, and therefore, is not subject to discharge limits that would apply to industrial discharges into the same water body. This is supported by the Los Angeles Flood Control decision, which concludes that the collection and discharge of storm water does not constitute the discharge of a pollutant. Arguably, this concept should be able to be applied to sewage systems which have been authorized and controlled by governmental bodies, as they also are a part of the system of water collection naturally flowing into the regional water “drainage” into navigable waters.

DiFrancesco, Bateman, Coley, Yospin, Kunzman, Davis, Lehrer & Flaum, PC (www.dbnjlaw.com ) is a full service law firm in New Jersey which provides a broad range of legal services, including the representation of clients in environmental and defense of toxic exposure matters. For additional information about the matters in this bulletin or in the firm’s environmental practice, please contactSteven A. Kunzman, Esq. who heads our Environmental and Latent Injury Litigation Department.

The information contained in this blog is intended solely for informational purposes; it is a advertising publication of DiFrancesco, Bateman, Coley, Yospin, Kunzman, Davis, Lehrer & Flaum P.C.This publication is intended to alert recipients of developments in the law and is not intended to provide legal counsel, advice or opinion on any specific facts or circumstances. The contents are intended as general information only. You are urged to consult a member of this firm or your own attorney concerning your particular situation and any specific legal questions you might have.

 

SUMMARY OF DEVELOPMENTS IN CERCLA AND NJ SPILL ACT: 2011

SteveK January 16th, 2012

This is a summary of some of the significant decisions of 2011 in CERCLA and N.J Spill Act litigation. ( Some of the decisions were previously reviewed in this blog.)

CERCLA

Arranger and Operator Liability:

In Nu-West Mining Inc. v. United States,786 F.Supp 2d 1082 (D.C. Idaho, 2011) the Federal District Court held that the U.S. Government was liable as both an arranger and operator under CERCLA at a site in the Caribou-Targhee National Forest that had been leased to a mining company. The court concluded that the permitting, inspection and oversight functions at four mines were sufficient involvement and control of the operations by the U.S. to impose liability.

The Court reviewed the law on arranger and operator liability.

A party is considered an arranger under CERCLA according to Burlington Northern & Santa Fe Railway Co. v. United States (BNSF), 129 S. Ct. 1870 (2009) when it “takes intentional steps to dispose of a hazardous substance.” Id. at 1879. Mere knowledge that spills would occur did not amount to “intent.” Further, the Court held that the analysis “requires a fact-intensive inquiry that looks beyond the parties’ characterization of the transaction as a ‘disposal’ or ‘sale’ and seeks to discern whether the arrangement was one Congress intended to fall within the scope of CERCLA’s strict-liability provisions.” Id.

For a party to be considered an operator of a facility under CERCLA  it must “manage, direct, or conduct operations specifically related to pollution, that is, operations having to do with the leakage or disposal of hazardous waste,  or decision about compliance with environmental regulations.” United States v. Bestfoods 524 U.S. 51, 66-67 (1998). If a party had the authority to control the cause of the contamination at the time of disposal, and actually exercised that control, then it is considered an operator. Id., citing, Kaiser Aluminum & Chem. Co. v. Catellus Dev. Corp., 976 F. 2d 1338, 1341 (9th Cir. 1992).

The Government began leasing mineral rights in the National Forest to various mining companies.  In accordance with the leases the Government inspected the mines to monitor the environmental conditions, properly disposing of mining waste, and to confirm royalty payments. The lease also required the lessees to “[prospect] diligently and to meet certain ore production requirements, and to pay a royalty fee.”  The Government also issued Special Use Permits so that rock waste dumps could be constructed on National Forest Lands adjacent to the leased lands. The Government also required the lessees to obtain “approval of plans for mining, waste disposal, and reclamation.”

The mine sites were determined to be contaminated with selenium, a naturally occurring chemical element that is found in a rock layer between phosphate ore zones. The mines were operated from 1960 until the 1990s. When the contamination was discovered in the 1990s, the lessee, Nu-West entered into Administrative Orders with the Government to remediate the sites. Nu-West claims to have spent over $10 million dollars and seeks to recoup those costs. In a motion for partial summary judgment Nu-West argued that the Government was an owner, arranger and operator under CERCLA. The motion did not address or resolve any defense to which the Government may be entitled, or any issue of damages.

The Court found that the Government not only owned the source of the contamination, it also had the authority to control the disposal of mining waste at the dump sites. The Court specifically noted that the lease provided that “no mining waste disposal could occur without its approval.” Further, the Court found that the Government exercised control over the disposal, and “showed its intent that disposal take place” by directing how the dumps should be covered.  The Court rejected the Government’s argument that it was acting in purely in a regulatory capacity, finding that its actions constituted a waiver of its sovereign immunity.” Citing, U.S. v. Shell Co. 294 F. 3d 1045, 1052-54 (9th Cir. 2002.); 42 U.S.C. §9620(a)(1) Accordingly, the Government was held as an arranger.

The Court also found there to be operator liability because the Government managed design and location of the dumps. In addition, the Government regularly inspected the dumps to ensure compliance with the mining plans and waste disposal guidelines.

In a subsequent motion reported at 2011 U.S. Dist. LEXIS 70854, the Court denied Nu-West’s motion for summary judgment on the Government’s counterclaim, seeking a ruling that the Government would not be entitled to legal fees. The Court was unable to conclude what costs may be “enforcement costs”  which a government may recover, as opposed to “necessary cost of response” which is what a private party may recover.

This case clarifies some of the issues on Governmental liability for actions at CERCLA sites, including that the Government can be liable when it is controlling the operations for its own benefit, not just in the use of its police power or in its sovereign capacity.

 

Owner Liability

In Los Angeles v. San Pedro Boat Works, 635 F. 3d 440 (9th Cir. 2011,) the Court held that the holder of a “revocable permit”  for a ship-berth in Los Angeles harbor had a mere possessory interest which did not arise to an ownership interest under CERCLA.

In this case, contamination arose from ship repairing activities that took place in Los Angeles Harbor. Pacific American purchased a revocable permit from the Harbor Commission in 1969 and held the permit for approximately 10 months. San Pedro Boat Works, a wholly owned subsidiary of Pacific American, was assigned the permit from Pacific American in 1970. San Pedro Boat Works was subsequently sold. Pacific American was acquired by BCI-Coca-Cola Bottling Company of Los Angeles in 1993.

Contamination was discovered in 1995 at the berth. The City cleaned up the contamination and commenced suit against San Pedro and Coca-Cola to recover the costs. San Pedro filed for bankruptcy shortly after suit was filed.

In deciding in favor of Coca-Cola, the Court first looked to CERCLA, but concluded that the definition of owner was tautological: an owner is “any person owning a facility.” 42 U.S.C. §9601(20)(A)(ii). The Court elected to rely upon the common law of the jurisdiction which distinguished title ownership from possessory interest.  It concluded that the “holder of a permit for a specific use of real property is not the owner of that real property.”  The Court, therefore, concluded that the permit holder was not the owner under CERCLA.  The Court rejected the test applied by the Second Circuit in Commander Oil Corp. v Barlo Equip, Co. 215 F. 3d 321 (2nd Cir. 2000) for de facto ownership: 1) whether the lease is for an extensive term and admits of no rights in the owner/lessor to determine how the property is used; 2) whether the lease cannot be terminated by the owner before it expires; 3) whether the leasee has the right to sublet all or some of the property without notifying the owner; 4) whether the lessee is responsible for payment of all taxes, assessments, insurance an operation and maintenance costs; and 5) whether the lessee is responsible for making all structural repairs. Id. at 330-331.

As a result there is a conflict as to what test is to be applied in the analysis of what constitutes an owner where the concepts of control over the operations and activities are at issue. The Ninth Circuit has focused on the common law, and has held this way both for the holder of an easement, see, Long Beach Unified School Distric v. Dorothy B. Godwin Cal. Living Trust, 32 F 2d 1364 (9th Cir. 1994), and now for a permit. Although the 2nd Circuit test was determined to create a “nebulous and flexible analytic framework” by the 9th Circuit, the Circuits are split on what test is to be applied.  It is unclear how the actual results would vary.

Arranger Liability

In Team Enterprises LLC v. Western Investment Real Estate Trust 2011 U.S.  App LEXIS 19881, the 9th Circuit concluded that the manufacturer of a dry cleaning machine was not liable for contribution to environmental cleanup costs under CERCLA.  Thea Plaintiff, a dry cleaner, used dry cleaning equipment manufactured by R.R. Street & Co. (Street) for their operations. The PCE-laden residue from the operations was deposited into a bucket for reuse; however, some was poured down the drain and leaked into the soil.

The Court analyzed whether a party can be considered an arranger under CERCLA where the equipment was sold for legitimate business purposes and was not created with the intent and purpose of disposing of hazardous waste. The Court took into account the requirement under BNSF that a party “must take intentional steps to dispose of a hazardous substance” to be considered an arranger. Supra, 129 S. Ct at 1879.

The Court also rejected the argument that Street had “exercised control over the disposal process” by designing the equipment that required the dry cleaner to dispose of the wastewater into the sewer.  The Court concluded that the instructions that suggested that the waste be poured into a bucket (which, according to the Plaintiffs, left no alternative but for the operator to pour that waste into the drain) did not present anything more than a suggestion or “recommendation;” there was no directive or other manner of control. Even the argument that Street knew that was how dry cleaners handled the residual waste was unavailing.  The Court affirmed the decision from the lower court that the facts do not support the requisite intent to dispose of waste as set forth by the Supreme Court in BNSF.

Arranger and Divisibility

The Lower Fox River cleanup litigation continues to provide interesting issues and analysis of a variety of issues under CERCLA.  There were a number of decisions in the case in 2011, the most significant one being Appleton Papers, Inc. et. al. v. George Whiting Paper Co., 776 F. Supp 2d 857 (E.D. Wis. 2011).

The Court had previously held that the Plaintiffs were not entitled to contribution for the expenses they had and will incur for cleanup costs “because they knowingly took that risk that the product that they mobilized [PCBs] would have long-lasting environmental consequences.” Id. at 859. Defendants sought to have the Court require that Appleton reimburse them for the costs they have incurred for their investigation and remediation at the site.  The Court conducted a thorough analysis and crafted a decision that placed most of the responsibility on the Plaintiff, except with regard to Operable Unit -1 (OU-1) which was upstream.

First, the Court addressed arguments that the Plaintiff should be liable as a successor to an arranger for the disposal of pollutants in OU-1. The predecessor, Appleton Coated Paper Company (ACPC) made carbon paper which utilized PCBs. ACPC sold waste from their processes through a broker that was used by other companies for making paper. The waste paper (known as “broke”) was recycled by the acquiring companies which resulted in PCBs being discharged into the Fox River Site.  Defendants argue that in this manner, ACPC arranged to dispose of a hazardous substance, thus making them liable for contamination at OU-1, even though their own discharges did not wind up in OU-1.  The Court conducted a thorough analysis of arranger liability under BNSF and concluded that although they did “enter into a transaction for the sole purpose of discarding a used and no longer useful hazardous substance;” however, there was insufficient evidence to support the conclusion that ACPC had the intent to dispose of the waste along with “the particular knowledge that non-trivial amounts of the broke waste product would inevitably end up in the river.” Id. at 864. The Court concluded that there were questions of fact, but indicated that it was unlikely that there would be sufficient evidence to support such a claim.

The Court also rejected that argument that all the operable units at the site were intertwined, and thus, Plaintiff could not obtain contribution from the Defendants (and therefore they were entitled to reimbursement) for costs for OU-1. The Court, however, confirmed a prior ruling that the costs for OU-2 through 5 fall squarely and completely on the Plaintiffs on the basis of fault, and that fault was such an overriding factor that is outweighed by any basis to impose equitable shares on the Defendants.  The Court then went on the wrestle with particular costs, including deciding that the costs that have been incurred were not outside the statutory limitations periods.

Subsequent Work Causing Release

In Saline River Properties LLC v. Johnson Controls, 2011 U.S. Dist. LEXIS 119516 the U.S. District Court for the Eastern District of Michigan, addressed whether a developer could be liable under CERCLA for conducting  development activities that may have moved contamination on the site and required additional cleanup.  Johnson Controls had owned property that it was remediating under a state issued administrative order.  Plaintiff became the operator of the property and at some point destroyed the building slab which Johnson alleges resulted in the migration of contaminants that would not have otherwise occurred.  The Court concluded that although passive migration would not have resulted in liability, there were questions of fact as to whether this action caused a release.

Citizens’ Suits

In Pakootas v. Teck Cominco (Pakootas II), 2011 U.S. App. LEXIS 10931 the 9th Circuit ruled that environmental groups, Indian tribes and other non-EPA parties may not bring a citizens’ suit to enforce the penalty provisions of CERCLA.

Pakootas II is part of the continuing dispute concerning the pollution of the Columbia River. The pollution originated from mining operations in British Columbia. Teck Cominco Metals, a Canadian mining company operated a smelter north of the U.S. –Canadian border which generated and disposed of slag into the Columbia River. Negotiations between the EPA and Teck Cominco American, Inc. faltered on issues of Canadian sovereignty and jurisdiction. The EPA eventually issued a unilateral administrative order (Order) directing Teck to investigate the nature and extent of contamination in the Upper Columbia River basin, and to evaluate remedial options.  Teck did not comply and the EPA took no enforcement actions, nor did it seek penalties.

Plaintiffs, later joined by the Confederated Tribes of the Colville Reservation and the State of Washington, pursued a citizens’ suit seeking:  (1) a declaration that Teck had violated the Order; (2) injunctive relief compelling Teck to comply with the Order; (3) penalties for non-compliance with the Order;  and(4) attorney fees and costs.

After Teck’s motion to dismiss the case based upon the argument that EPA could not apply CERCLA extra-territorially was denied, Teck and the EPA entered into a “contractual agreement” to address the contamination at the site.  As part of the agreement, the EPA agreed to a covenant not to sue Teck for penalties or injunctive relief relating to non-compliance with the Order, subject to its satisfactory performance of its obligations under the agreement.

Plaintiffs amended their complaint and dismissed the claims for injunctive and declaratory relief, but continued to assert the claims for penalties for non-compliance with the Order. The 9th Circuit affirmed the dismissal of the suit concluding that the penalty provisions are a “hammer” to be wielded exclusively by the EPA to compel compliance. Further, the Court aptly noted that if Teck were compelled to pay the penalties to Plaintiffs prior to the agreed upon remediation,” it might find it economically advantageous to walk away from the further cleanup efforts…” which would have a perverse result, and would not further the intent to compel site remediation.

 

Section 113 & Private Nuisance Claims

On August 13, 2011, the Federal District Court for the District of New Jersey continued to clarify the limits of Section 113 claims under CERCLA and  also addressed common law claims of a subsequent property owner in Queens West Development Corporation v. Honeywell International, Inc. 2011 U.S. Dist. LEXIS 91795. Plaintiff acquired property formerly operated by Warren Chemical Works, which was subsequently acquired by Honeywell. The property was contaminated from discharges of substantial amounts of creosote, coal tar, and related substances. The property was to be redeveloped by plaintiff for residential, commercial and recreational uses. Plaintiff claimed to have incurred over $16 million in investigation and remediation costs, and anticipated total response costs that would be equal to or exceed $20 million. Defendant moved for dismissal of various counts of the complaint including claims in Count Two of the Complaint, under Section 113 of CERCLA, claims in Count Three for common law private nuisance, and claims in Count Four for restitution.  In deciding the case, the Court addressed the intersection between claims under Section 107 of CERCLA and Section 113. The Court noted that the case presented a unique issue: “whether a party that voluntarily undertakes a cleanup action can maintain a claim for contribution under § 113(f)(3)(B), when it has simultaneously asserted a claim for cost recovery under § 107(a).” The Court noted that courts have explained that Section 107 “authorizes the United States, a state, or `any other person’ to seek reimbursement for all removal or remedial costs associated with the hazardous materials on the property, provided that those actions are consistent with the National Contingency Plan,” and that the United States Supreme Court held in Atlantic Research that the “plain language” of § 107 “authorizes cost-recovery action by any private party, including PRPs.” As a result, a private party is not required to establish its own liability in order to assert a claim under  Section 107. Section 113(f)(3)(B), however, allows the assertion of a right of contribution only “to PRPs that have settled their CERCLA liability with a [S]tate or the United States through either an administrative or judicially approved settlement.” Since Plaintiff had voluntarily incurred the response costs, is not a PRP, and did not enter into an approved settlement or resolved all their liability to the U.S. or the State of New York, they could not maintain the  Section 113 claim. Thus, the Court dismissed the  Section 113 claim contained in the Second Count.

The Court next addressed the claims for private nuisance. As the proceeding was in New Jersey, but involved New York property, the Court considered the law of private nuisance in both jurisdictions. The Court concluded that the law was the same, and that although a private nuisance “consists of an interference with one’s interest in the private use and enjoyment of land” it only applies to interference with use of adjoining land, not to subsequent owners of the same property.

Finally, the Court refused to dismiss the restitution claim. Defendants argued that it should be dismissed since it is preempted by CERCLA. The Court refused to dismiss the claim, however, since it remained an alternative common law claim that would survive if the Plaintiff fails to prove the claim under Section 107 of CERCLA.

Case to Watch: Sackett

Sackett v. EPA is a case that is scheduled for argument before the U.S. Supreme Court this term. Although it is not a CERCLA case, it may have a significant impact on enforcement of federal environmental statutes.  The primary issue presented by Sackett is whether pre-enforcement review is available for EPA administrative orders. Pre-enforcement review refers to the ability of the recipient of such an order to obtain judicial review of the order without having to wait to be sued by the EPA. This is not applicable to CERCLA since CERCLA has an express provision prohibiting pre-enforcement review. 42 U.S.C. §9613(h).

The Court will consider whether a bar to pre-enforcement review can be implied into the Clean Water Act (CWA), as has been argued by the EPA, and whether such an implied ban would violate the due process clause of the U.S. Constitution.

In Sackett the plaintiffs had filled a wetland area on their 0.63 acre parcel without a CWA permit. The EPA issued an administrative compliance order requiring that the fill be removed and that the wetland be restored.  The Sacketts petitioned the EPA for a hearing to challenge the wetland determination. After the EPA refused, the Sacketts filed suit.  The District Court dismissed the suit and the Sacketts appealed to the 9th Circuit.  Before the 9th Circuit they argued (1) that the Administrative Procedures Act (APA) allows pre-enforcement review of CWA compliance orders; and (2) that pre-enforcement review is required by due process.

The Circuit Court rejected both arguments. It rejected the argument under the APA essentially finding that pre-enforcement review is not provided for in the CWA and that the presumption in favor of judicial review is overcome where “congressional intent to preclude judicial review is fairly discernible in the statutory scheme.” Sackett v. EPA 622 F. 3d 1139,1143 (9th Cir, 2010). The Court concluded that pre-enforcement review would frustrate the goal of addressing environmental problems quickly and would negate the EPA’s statutorily created choice between filing a suit or acting unilaterally through an administrative order.

The 9th Circuit rejected the due process arguments finding that it had been satisfied because: (1) judicial review was available once the EPA brings an enforcement action; (2) the Sacketts could have sought to obtain a §404 permit to fill the property, which would be reviewable by the district court if denied; and (3) the court, not the EPA, can impose penalties under the CWA based upon a range of factors. [1] The decision could have far reaching implications, even effecting CERCLA if the Supreme Court reverses on the basis of due process. [2]

 

NEW JERSEY SPILL ACT

Primary Jurisdiction

In Magic Petroleum, Inc. v. Exxon Mobil, 2011 N.J. Super. Unpub. LEXIS 2021, the New Jersey Appellate Division dismissed, without prejudice, Magic’s claim for contribution of remedial costs against Exxon due to NJDEP’s primary jurisdiction of the remedial investigation at the plaintiff’s property. Plaintiff had been the subject of an administrative consent order (ACO) to investigate and remediate contamination at its property resulting from leaking underground storage tanks.  Plaintiff contended that the majority of the contamination came from the neighboring Exxon station and refused to comply with its obligations under the ACO until the NJDEP required Exxon to participate in the investigation. Magic litigated its obligations under the ACO through administrative proceedings, and was required to follow the order. Magic, however,  continued to refuse to conduct the investigation, insisting that the investigation should be imposed upon and shared by Exxon. The NJDEP eventually took over the investigation of the plaintiff’s property. Magic then commenced a contribution action against Exxon.

Exxon filed a motion to stay or dismiss the proceedings, without prejudice, pending the NJDEP’s investigation and remediation of the Magic property, arguing that the NJDEP’s efforts must precede any decision by the court. The trial judge dismissed the case, deferring to the NJDEP’s primary jurisdiction. The Appellate Division affirmed.  The Appellate Court noted that under the doctrine of “primary jurisdiction” a court may defer to an agency where the resolution of an issue is within the special competence of the agency. The court further noted that private contribution rights under the Spill Act require the court to allocate responsibility for remediation costs, but that the initial determination of whether a party is responsible can be decided by the NJDEP, and that “only the DEP can define the contaminants, determine the extent of the discharge, identify the authorized forms of investigative testing, and permissive methodology of cleanup.” Furthermore, “to be entitled to reimbursement and contribution under the Spill Act, a party must obtain written approval under from the DEP of the investigation and proposed remedial action.”  Accordingly, the court concluded that these decisions were within the scope of the special expertise of the DEP and should be determined prior to the case being able to proceed.

This decision demonstrates that a responsible party under the Spill Act that does not conduct investigation and remediation, but allows it to be done by the State, does so at its peril. To do so may have a significant impact in the party’s ability to pursue a contribution claim against other responsible parties, as it allows the NJDEP to determine and define the scope of the investigation, remediation, and possibly to potentially influence any future contribution claim or allocation. It is interesting to consider the effect of the Site Remediation Reform Act (SRRA) on the statements by the court that the DEP will define the contaminants, the extent of the discharge, the forms of investigation and the method of cleanup. Under the SRRA these determinations can be made by a Licensed Site Remediation Professional (LSRP), in accordance with the regulations for site investigation and remediation, referred to the Tech. Regs.  Accordingly, it may not be that the DEP has to make these decisions. This points, again, to the importance of the party seeking contribution to address and control the response in order to be able to develop the information, and assert and control the contribution claim.

Nexus

In NJDEP v. Ofra Dimant, et.al 418 N.J. Super 530 (App. Div. 2011), cert. granted, 208 N.J. 381 (2011), the New Jersey Appellate Division recently confirmed that liability under the Spill Act, requires a connection between the discharge of a contaminant and the contamination of the environment of that contaminant that was caused by the discharge. In that case, the defendants included succession of owners and operators of a dry cleaning establishment. The contamination in the groundwater included the well-known dry cleaning chemical, PCE, as well as the byproducts of its degradation: TCE and DCE.  There was evidence that the PCE was related to the dry cleaning operations. All but one of the direct defendants settled with the State.  The remaining defendant went to trial. The trial judge found that although there were discharges or releases of PCE during the stewardship of the remaining defendant, there was no proof that those discharges went through the asphalt and contaminated the environment.  Since there was no nexus between the discharge and the remediation, the claims against the defendant were dismissed. The State also sought leave to amend the complaint to add certain other prior operators. The denial of that motion by the trial judge was affirmed as being made too late in the case; in fact, it was made near the end of the trial.  This case affirms the need for the State or any plaintiff in a Spill Act case to demonstrate a nexus; and further reaffirms that there is no liability for passive migration of contaminants during the ownership of property.

NRD Common Law Claims – Limitations of Actions

In New Jersey Dep’t of Env. Protection v. Exxon Mobil Corp, 405 N.J. Super 395 (App. Div. 2011) the court held that the State’s common law strict liability claims for NRDs were not barred by the general ten-year statute of limitations applicable to actions commenced by the State. N.J.S.A. 2A:14-1.2. The court, reversing the trial court, held that an exception to the ten-year statute, specific to environmental laws, known as the Extension Statute, N.J.S.A. 58:10B-17.1, applies not only to statutory environmental laws, but also to common law causes of action implementing environmental programs.
The Extension Statute provides:

b. (1) Except where a limitations provision expressly and specifically applies to actions commenced by the State or where a longer limitations period would otherwise apply, and subject to any statutory provisions or common law rules extending limitations periods, any civil action concerning the payment of compensation for damage to, or loss of, natural resources due to the discharge of a hazardous substance, commenced by the State pursuant to the State’s environmental laws, shall be commenced within five years and six months next after the cause of action shall have accrued.

Exxon argued that the Extension Statute’s use of the term “environmental laws” after a listing of 9 prior statutes,  limited the extension to statutory causes of action. The Appellate Division, however, looked to legislative history and concluded that the legislature intended to expand the scope of the authority of the DEP, not to limit it. As a result, NJDEP has the ability to pursue common law causes of action, along with the strict liability provision of Spill Act, in matters involving NRDs; neither of which will be constrained by the general ten-year statute. This decision may be important as common law remedies and damages may be broader and may permit the State to seek to present their case before a jury as there is some question whether there is a right to a jury trial under the Spill Act.

 

In a separate decision, the Appellate Court also ruled on the State’s claim for an interlocutory payment by Exxon Mobil for natural resource damage assessment costs of approximately $1 million.  The costs represent the invoices of five experts that prepared reports for DEP regarding the claimed natural resource damages under the Spill Act. The Court affirmed the trial court’s denial of the interim payment since there is a significant dispute as to the reasonableness of the costs and whether they are duplicative of defendant’s efforts. The panel concluded that the award of such costs is best reserved until resolution of the factual issues at trial.

NRD : Use of Resource Equivalency Analsyis (REA)

In  NJDEP v. Union Carbide, (Middlesex County, MID-L-5632-07, March 29, 2011) the trial Court rejected for the second time the State’s effort to employ a resource equivalency analysis (REA) or habitat equivalency analysis (HEA) to place a value on the loss of use of groundwater as a natural resource. The trial court had previously rejected REA in NJDEP v. Essex Chemical, (Middlesex County, Docket No.: MID-L-5685-07, July, 2010). The trial court concluded that the expert had not conducted a proper analysis of the particular services that were claimed to have been lost by the public due to the contamination, other than the remedial costs which were being conducted by the defendant. The court also ruled that there was no basis to compel the defendants to cleanup more expeditiously since the entire remedial endeavor had been with the approval and oversight of the NDJEP, albeit a different arm than the Office of Natural Resources and Recovery (ONRR). Finally, the court rejected the State’s nuisance claim since the plaintiff’s had not satisfied their burden of showing that the contamination of the groundwater interfered with the public’s use or enjoyment of the resource, further noting that the groundwater in question was never available to the public since it was below private property; therefore. “Plaintiffs have not shown how the public has been deprived of anything.” [Slip. Op. p. 13]


[1] Similar issues were addressed by the N.J. Supreme Court in In the Matter of the Directive to Kimber Peteroleum, 110 N.J. 69 (1988)

[2] It may be questionable whether the Court would go so far, considering it refused to consider a similar challenge regarding CERCLA administrative orders in General Electric v. Jackson, 595 F. Supp. 2d 8 (D.D.C. 2009).

DiFrancesco, Bateman, Coley, Yospin, Kunzman, Davis, Lehrer & Flaum, PC (www.dbnjlaw.com ) is a full service law firm in New Jersey which provides a broad range of legal services, including the representation of clients in environmental and defense of toxic exposure matters. For additional information about the matters in this bulletin or in the firm’s environmental practice, please contactSteven A. Kunzman, Esq. who heads our Environmental and Latent Injury Litigation Department.

The information contained in this blog is intended solely for informational purposes; it is a advertising publication of DiFrancesco, Bateman, Coley, Yospin, Kunzman, Davis, Lehrer & Flaum P.C.This publication is intended to alert recipients of developments in the law and is not intended to provide legal counsel, advice or opinion on any specific facts or circumstances. The contents are intended as general information only. You are urged to consult a member of this firm or your own attorney concerning your particular situation and any specific legal questions you might have.


Steven Kunzman to Co-Chair Seminar on Groundwater Contamination

SteveK August 15th, 2011

Steve Kunzman, partner in the firm, will be a co-chair of a comprehensive conference:

Groundwater Contamination and Vapor Intrusion Cases

The seminar, which will be put on by Law Seminars International, will take place at the Sheraton Newark Airport Hotel on September 15 and 16.

For more information and to register go to: http://www.lawseminars.com/seminars/11GWATNJ.php

The speakers include noted attorneys, remediation consultants and and other noted experts in the field. The seminar is co-chaired by Ira Gottlieb of McCarter & English. Steven and Ira will also be speaking on insurance coverage issues relating to groundwater claims.

EPA releases Draft Clean Water Strategy and seeks further comment.

SteveK August 20th, 2010

On August 20, 2010, the EPA posted its Draft Clean Water Strategy for review and comment. The Draft resulted from the Coming Together for Clean Water Conference which was hosted by EPA Administrator Lisa P. Jackson this past April. The Draft identifies the challenges to continuing the efforts launched by the 1972 passage of the Clean Water Act. While acknowledging the significant progress that has occurred since then, the community involved recognizes that much more needs to be done to revitalize the resources. The Draft further presents the significant economic benefits which can be realized from having clean water and in taking the actions and building the infrastructure to achieve the goals. The Draft demonstrates the continued viewpoint that environmental protection is not a drain on economic growth but a significant component of our development.

A copy of the Draft, information on the April conference, and information on providing comments on the draft, can be found on the EPA website at: http://blog.epa.gov/waterforum/ Comments will be accepted until September 17, 2010.

DiFrancesco, Bateman, Coley, Yospin, Kunzman, Davis & Lehrer, PC (www.dbnjlaw.com ) is a full service law firm in New Jersey which provides a broad range of legal services, including the representation of clients in environmental and defense of toxic exposure matters. For additional information about the matters in this bulletin or in the firm’s environmental practice, please contactSteven A. Kunzman, Esq. who heads our Environmental and Latent Injury Litigation Department